Durham Sixth Form (Proud to support education locally)

What does it take to make a new digital media centre? Montage of building images.
What does it take to make a new digital media centre?
Aerial shot of site preparations
Site preparations
Man surveying site
Works on site underway
Two men and a digger
Works on site underway
Steel frame being erected
Steel frame being erected
Flooring works underway
Flooring works underway
Roofing works underway
Roofing works underway
Picture of general building works
Work is progressing well
Aerial shot of site with work in progress
Work is progressing well
Aerial shot of Durhan 6th Form
Work is progressing well
Side shot of building
Work is progressing well
Staircase installation
Staircase installation
Aerial shot of whole site
Work continuing
Shot of roof
Works continuing
Side image of building
Finishing touches
Aerial shot of nearly finished building
Nearing completion
Another aerial shot of nearly finished building
Nearing completion
Side shot of nearly completed building
Nearing completion
An internal corridor
An internal corridor
A half-finished internal corridor
An internal corridor
A completed internal corridor
A completed internal corridor
Room with tables and chairs
Room ready for use
Studio
Studio ready for use
Completed building
Ready for students
Completed building with students
Students arrive
Prev
Next

In the heart of Durham City our Construction Services team built a brand new multi-million pound digital media centre, complete with high-tech IT hub, multimedia room, TV studio, cinema, conference / event room and 13 classrooms for the large post-16 school in the North East. As well as this, students can enjoy a new games room and have a bite to eat in the building’s café. 

This multi-million pound project was project-managed and constructed by our in-house team.

The project delivery was complex, and we worked with Durham University archaeologists to map and record findings as excavation works were undertaken, handle the logistical issues on site due to the proximity to school and leisure centre, and worked with residents and businesses to minimise disruption. At its height, we had sixty-three highly skilled council workers and 13 locally sourced subcontractors working tirelessly to ensure the project was completed on time, despite meeting some challenging ground and weather conditions along the way.

Ellen Beveridge, Head Teacher commented: “On opening we enrolled over 900 students into year 12, our highest ever intake. I was so proud and delighted to see them walk into our new Digital Media Centre, it was amazing and we were so happy.  Thank you so much again – I never underestimated the amount of work (and push) that had been needed during the building process. A brilliant team, well done and again, thank you on behalf of us all at Durham Sixth Form.”

Copyright © 2025 · Marketgate on Genesis Framework · WordPress ·

  • Legal information |
  • Accessibility Statement |
  • Useful links |
  • Eshop |
  • Newsletters |
  • Customer Login
  • Linked in Logo