You are here: Home / Building and facilities / Building and facilities case studies / Current construction projects / Green Lane Offices, Spennymoor

Green Lane Offices, Spennymoor

Green Lane Offices external building work
April 2019 – phase one: external scaffolding
Green Lane Offices internal building work
May 2019 – phase one: internal works including window installation
Green Lane Offices new kitchen area
June 2019 – phase one: kitchen decoration and remodelling of kitchen electrical power circuits
Internal works including initial mechanical and electrical work
June 2019 – phase one: internal works including initial mechanical and electrical work
Desks and chairs
June 2019 – phase one: completed internal work
Partition walls
July 2019 – phase two: installation of new partition walls and power and data
New floor coverings
July 2019 – phase two: new floor coverings
Decoration and installation of art work
August 2019 – phase two: decoration and installation of art work
New furniture
September 2019 – phase two: new furniture layout
Completed tea point and welfare area
September 2019 – phase two: completed tea point and welfare area
Completed office and informal meeting area
September 2019 – phase two: completed office and informal meeting area
Removal of existing furniture
September 2019 – phase three: removal of existing furniture
Removal of old flooring
October 2019 – phase three: removal of old flooring
Installation of stud walls and power and data rewire
October 2019 – phase three: installation of stud walls and power and data rewire
Green Lane plastering of stud walls
November 2019 – phase three: completed plastering of stud walls
Green Lane painting stud walls
November 2019 – phase three: painting of new stud walls
Green lane window installation
November 2019 – phase three: installation of new window units
Green Lane decoration and installation of art work
January 2020 - Phase three: decoration and installation of art work
Green Lane new furniture layout
January 2020 - Phase three: new furniture layout
Green Lane meeting area
January 2020 - Phase three: meeting area
Green Lane Phase 3 tea point and welfare area
January 2020 - Phase three: tea point and welfare area
Green Lane Phase 3 Informal meeting area with new art work
January 2020 - Phase three: informal meeting area and new art work
Green Lane Phase 3 office layout
January 2020 - Phase three: office layout
Green Lane Phase 3 meeting area
January 2020 - Phase three: meeting area
COVID-19 Distancing Guidelines
COVID-19 Distancing Guidelines
Office doorway during strip out
Phase 4 - Office doorway during strip out and demolition works
Internal Area
Phase 4 - Internal area during strip out and demolition works
External work has started to the quadrangle.
External work has started to the quadrangle.
Completed landscaping to the quadrangle.
Completed landscaping to the quadrangle.
Prev
Next

Construction Services are working on a phased refurbishment project to create an improved and energy-efficient office environment.

The whole project, to be completed by Spring 2021, includes replacing timber windows, soffits, and facias with new UPVC double glazed windows, electrical and mechanical works, flooring, decoration, and the installation of a new passenger lift.

Large modern office space is being created with separate seating areas, lockers, cloakroom, and fitted kitchen areas. New meeting rooms are also being created, equipped with an electronic room booking system.

Demolition/strip out works have commenced on phase 4 of the project which is due to complete in December 2020, the external landscaping to the quadrangle is now completed.

Primary Sidebar

Contact us

New customers:

03000 269 359

dsbd@durham.gov.uk

  • Legal information
  • |
  • Accessibility Statement
  • |
  • Contact
  • |
  • Mailing list
  • |
  • Useful links
  • |
  • A to Z
  • Facebook Logo
  • Twitter Logo
  • Instagram Logo
We understand the critical role schools, academies and other public sector organisations have in the fight against COVID 19. As a result of national guidance, many of our staff are working from home but are available to support customers via telephone, conferencing, portal or email. We may have to reduce support in some non-essential areas, therefore, if you are unable to contact us through your normal communication channels, you can contact us through our Customer Services Helpdesk on 03000 26 0000 or by email commercialservices@durham.gov.uk
Dismiss