Green Lane Offices, Spennymoor

Green Lane Offices external building work
April 2019 – phase one: external scaffolding
Green Lane Offices internal building work
May 2019 – phase one: internal works including window installation
Internal works including initial mechanical and electrical work
June 2019 – phase one: internal works including initial mechanical and electrical work
New office space created
June 2019 - Phase one : New office space created
New kitchen area
June 2019 - phase one : New facilities
Partition walls
July 2019 – phase two: installation of new partition walls and power and data
New floor coverings
July 2019 – phase two: new floor coverings
New office space created with lockers for personal storage
June 2019 - phase two : New office space created with lockers for personal storage
New furniture
September 2019 – phase two: new furniture layout
Completed tea point and welfare area
September 2019 – phase two: completed tea point and welfare area
Removal of old flooring
October 2019 – phase three: removal of old flooring
Green Lane plastering of stud walls
November 2019 – phase three: completed plastering of stud walls
Green Lane painting stud walls
November 2019 – phase three: painting of new stud walls
New spaces created with artwork
January 2020 - phase three : New spaces created with artwork
Green Lane new furniture layout
January 2020 - Phase three: new furniture layout
Green Lane meeting area
January 2020 - Phase three: meeting area
Green Lane Phase 3 tea point and welfare area
January 2020 - Phase three: tea point and welfare area
Green Lane Phase 3 Informal meeting area with new art work
January 2020 - Phase three: informal meeting area and new art work
COVID-19 Distancing Guidelines
COVID-19 Distancing Guidelines
Office doorway during strip out
Phase 4 - Office doorway during strip out and demolition works
Green Lane Phase 4 - Celing
Phase 4 - Installation of new ceiling grid.
Green Lane Phase 4 completed Room
Phase 4 - New storage and staff area.
External work has started to the quadrangle.
External work has started to the quadrangle.
Green Lane complition of Quadrangle
December 2020 - Completion of landscaping.
Completion of landscaping
December 2020 - Completion of landscaping
Green Lane Offices completed confrence room.
Phase 5 - Completed refurbished of conference room.
Green Lane Offices completed installation of floor sockets.
Phase 5 - Completed installation of floor sockets within main conference area.
Prev
Next

Construction ServicesΒ have worked in partnership withΒ Construction Consultancy ServiceΒ on a phased refurbishment project and have created an improved and energy-efficient office environment. This project was successfully completed in summer 2021.

The project, which commenced in 2019, included replacing timber windows, soffits, and facias with new UPVC double glazed windows, electrical and mechanical works, flooring, decoration, and the installation of a new passenger lift.Β  A new large modern office space has been created with separate seating areas, lockers, cloakroom, and fitted kitchen areas. Β New meeting rooms have been created, equipped with an electronic room booking system.

The project also included the external landscaping to the quadrangle.

About the project

The Inspire Transformation Programme looked to bring a change to the Council, with a focus on changing the way we work to improve the service we can provide to customers.Β  Inspiring Places are flexible working spaces that are paper-lite and clutter free.

Primary Sidebar

Filter:

  • Show all
  • Buildings and Facilities
  • Finance and Payroll
  • HR and Legal
  • H&S and Occupational Health
  • ICT Services
  • Education Support
  • Procurement
  • General News

Contact us

New customers:

03000 269 359

dsbd@durham.gov.uk

  • Legal information
  • |
  • Accessibility Statement
  • |
  • Contact
  • |
  • Mailing list
  • |
  • Useful links
  • |
  • A to Z
  • Facebook Logo
  • Twitter Logo
  • Instagram Logo