Beamish Primary – Heating and Pipework

Heat Pump
Installation of heat pump
High Level Pipework
High level pipework prior to boxing
Pipework and Boxing
Pipework and Boxing
High Level Pipework New Convector
New high level pipework installation prior to boxing and new convector being installed
New Radiator
New radiator
Prev
Next

The heating pipework at Beamish Primary was in the region of 50 years old and had begun to spring leaks in places.   The original pipework was located in ducts beneath the floor, in damp conditions, which allowed the pipe to deteriorate.

The new pipework is run at high level within the school, and any pipework which drops to low level is ‘boxed’ to prevent damage.  New radiators and convector heaters have been installed throughout the School to provide a more effective and efficient heating system.

A new heating pump has also been installed within the plant room to match the characteristics of the new heating system.

Primary Sidebar

Filter:

  • Show all
  • Buildings and Facilities
  • Finance and Payroll
  • HR and Legal
  • H&S and Occupational Health
  • ICT Services
  • Education Support
  • Procurement
  • General News

Contact us

New customers:

03000 269 359

dsbd@durham.gov.uk

  • Legal information
  • |
  • Accessibility Statement
  • |
  • Contact
  • |
  • Mailing list
  • |
  • Useful links
  • |
  • A to Z
  • Facebook Logo
  • Twitter Logo
  • Instagram Logo